Efficiency Measurement IPA

Within the IPA project, an efficiency measurement system was installed in 17 hydroelectric power plants belonging to EUAS in accordance with IEC Standards 60041 and 62006(class B) standards, and remote monitoring was provided.

The installed power of Alpaslan HEPP is 4 X 41,75 MW
The installed power of Aslantaş HEPP is 3 X 46 MW
The installed power of Akköprü HEPP is 2 X 57,5 MW
The installed power of Atatürk HEPP is 8 X 300 MW
The installed power of Batman HEPP is 3 X 62,15; 1 X 7 MW
The installed power of Çatalan HEPP is 3 X 56,3 MW
The installed power of Dicle HEPP is 2 X 55 MW
The installed power of Ermenek HEPP is 2 X 151,2 MW
The installed power of Hirfanlı HEPP is 4 X 32,4 MW
The installed power of Kapulukaya HEPP is 3 X 18,2 MW
The installed power of Karkamış HEPP is 6 X 32,14 MW
The installed power of Keban HEPP is 4 X 157,5 ; 4 X 181,1 MW
The installed power of Kralkızı HEPP is 2 X 48,83 MW
The installed power of Özlüce HEPP is 2 X 86,75 MW
The installed power of Seyhan HEPP is 3 X 20 MW
The installed power of Sır HEPP is 3 X 96,6 MW
The installed power of Suat Uğurlu HEPP is 2 X 23 MW