CFD Analysis

It is aimed to evaluate the current performances of turbines in 5 different hydroelectric power plants within the scope of the project by numerical analysis. As a result of reverse engineering modeling of the turbine structures of the units and simulations in flow conditions, the existing design problems and characteristic structures were examined.

The installed power of Altınkaya HES 4 X 180 MW
The installed power of Atatürk HES 8 X 300 MW
The installed power of Gezende HES 3 X 54,2 MW
The installed power of Karkamış HES  6 X 32,14 MW
     The installed power of Kılıçkaya HES  2 X 62 MW