CFD Analysis
It is aimed to evaluate the current performances of turbines in 5 different hydroelectric power plants within the scope of the project by numerical analysis. As a result of reverse engineering modeling of the turbine structures of the units and simulations in flow conditions, the existing design problems and characteristic structures were examined.
|
The installed power of Altınkaya HES 4 X 180 MW
The installed power of Atatürk HES 8 X 300 MW
|
The installed power of Gezende HES 3 X 54,2 MW
The installed power of Karkamış HES 6 X 32,14 MW
|
The installed power of Kılıçkaya HES 2 X 62 MW |