IPA Projects

  • IPA 2013 Analysis of Hydro Power Generation Facilities Pilot Project (CS01C)

    The IPA 2013 Analysis of Hydro Power Generation Facilities Pilot Project built a real-time performance monitoring system in two HPPs to determine the performance loss of hydraulic turbines and other primary auxiliary equipment over time.

    The project carried out activities such as operation analysis, measurement tools analysis and evaluation of unit design on production equipments. Further evaluations, such as visual control, maintenance records and interviews with the practitioners were also utilised to prepare a final report, summarizing the findings and proposed areas for improvements.

    Click here for kick-off meeting.

    Stakeholders: EUAS, Directorate for EU Affairs, EU Delegation, WB
    Contractor: Hatch Ltd., SU-ENER Engineering and Energy Services Industry and Trade Ltd. Co., SUIS Project Eng. Cons. Co. Ltd.
    Commencement Date: 15 March 2017
    Completion Date: 30 June 2019