Vibration Measurement
Within the project, turbine-generator vibration levels in the beds of the existing units in 14 different hydroelectronic power plants were measured and reported according to the ISO 20816 standard, and evaluations were made about the problems observed.
| The installed power of Alpaslan HEPP is 4 X 41,75 MW The installed power of Altınkaya HEPP is 4 X 180 MW The installed power of Aslantaş HEPP is 3 X 46 MW The installed power of Batman HEPP is 3 X 62,15; 1 X 7 MW The installed power of Çatalan HEPP is 3 X 56,3 MW |
The installed power of Dicle HEPP is 2 X 55 MW The installed power of Gezende HEPP is 3 X 54,2 MW The installed power of Hasan Uğurlu HEPP is 4 X 125 MW The installed power of Kapulukaya HEPP is 3 X 18,2 MW The installed power of Karkamış HEPP is 6 X 32,14 MW |
The installed power of Kılıçkaya HEPP is 2 X 62 MW The installed power of Obruk HEPP is 2 X 52,7 MW The installed power of Sır HEPP is 3 X 96,6 MW The installed power of Suat Uğurlu HEPP is 2 X 23 MW |