Condition Assesment
Power Plant Equipment Condition Assessment Report; It has been prepared by examining the suggestions for the control, estimation and optimization of the physical and functional conditions of the electromechanical equipment available in 14 different hydroelectric power plants within the scope of the project.
|
The installed power of Alpaslan HEPP is 4 X 41,75 MW
The installed power of Altınkaya HEPP is 4 X 180 MW The installed power of Aslantaş HEPP is 3 X 46 MW The installed power of Batman HEPP is 3 X 62,15; 1 X 7 MW The installed power of Çatalan HEPP is 3 X 56,3 MW |
The installed power of Dicle HEPP is 2 X 55 MW
The installed power of Gezende HEPP is 3 X 54,2 MW The installed power of Hasan Uğurlu HEPP is 4 X 125 MW The installed power of Kapulukaya HEPP is 3 X 18,2 MW The installed power of Karkamış HEPP is 6 X 32,14 MW |
The installed power of Kılıçkaya HEPP is 2 X 62 MW
The installed power of Obruk HEPP is 2 X 52,7 MW The installed power of Sır HEPP is 3 X 96,6 MW The installed power of Suat Uğurlu HEPP is 2 X 23 MW |